Note 1 / 4
This part sets when the rent is reviewed and how the new amount is determined. The method matters as much as the date.
Where it often goes wrong
The tenant budgets for the starting rent without checking how later reviews may change it.
Before you sign a lease, during the years you are in the building, and when you want to leave. The cheapest point to get help is the first one, and almost nobody does.
A business lease can be a large financial commitment. A ten-year lease at £30,000 a year is a £300,000 obligation. The agent's summary of the proposed deal, called heads of terms, does not replace reading the lease.
The obligations are agreed before signature. Once you sign, you must comply with them, negotiate changes or agree terms to leave.
Check the repair obligations, the conditions for leaving early and the way rent can change. These are called the repairing covenant, break clause and rent review mechanism. They can create costs beyond the rent you first agreed.
A clause allowing the lease to end early, called a break clause, usually has conditions. These can include current rent payments, an empty property and no material breach. The conditions are interpreted strictly: failing one can remove the break right and leave the lease continuing to the end of its term.
A full repairing and insuring (FRI) lease makes you responsible for the building's condition. The repair obligation can require you to return it in better condition than you received it. A record of the starting condition, called a schedule of condition, needs to be agreed before signature and attached to the lease with photographs. Without it, you may face a bill for restoring a building that was already in poor condition.
Part II of the Landlord and Tenant Act 1954 protects business tenancies unless the parties exclude that protection through a process called contracting out. The process requires a warning notice before the lease is agreed and a declaration from the tenant. If the procedure is defective, the lease can remain protected. A tenant who agrees to exclude protection has no right to renew under it.
Illustrative extract
01 / Rent review
The rent will be reviewed on the review date using the method stated in this lease.
02 / Break clause
The tenant may end the lease on the break date by giving notice in the required form and meeting the stated conditions.
03 / Repairing obligations
The tenant must keep the premises in the condition required by the repair provisions and any agreed schedule of condition.
04 / Assignment and subletting
The tenant may transfer the lease or sublet only as allowed by this lease, obtaining consent where required.
Note 1 / 4
This part sets when the rent is reviewed and how the new amount is determined. The method matters as much as the date.
The tenant budgets for the starting rent without checking how later reviews may change it.
Note 2 / 4
A break clause gives a right to end the lease before its full term. The notice requirements and any conditions need to be read together.
A tenant focuses on the break date but misses a condition or the required way of giving notice.
Note 3 / 4
This part allocates responsibility for repairs. A schedule of condition records the property's condition and may limit the obligation if the lease says so.
Existing damage is assumed to be excluded, although the lease does not limit the tenant's responsibility.
Note 4 / 4
These provisions are sometimes called alienation clauses. Assignment transfers the lease to another tenant. Subletting creates a tenancy beneath the existing lease.
A business plans to leave or share the premises without checking restrictions and consent requirements.
Premises
The proposed terms can be negotiated before signing. Review the obligations while the agent's summary of terms is still open for discussion.
The lease continues to impose deadlines, including dates for rent review and notice to leave early.
Ending or renewing a lease involves notice periods and required timing. Starting late can remove options.
Forfeiture is a landlord's right to end the lease for breach. Demanding or accepting rent after knowing of a breach can waive that right.
A lease records what the tenant must pay, repair and do before leaving. A formal notice can start a timetable to end or renew a tenancy, and missing the required timing can remove a right to renew. A schedule of dilapidations lists the repairs claimed by the landlord; the claim needs to be tested against the lease and the limits on damages. If you are not sure what any of this is called, describe it in your own words and we will work out what it is.
A first consultation will tell you what the work involves and what it costs.